Kaiser Oakland Hospital Replacement
AE3 provided construction management and traffic engineering services as part of the McCarthy Construction design/build team for the Kaiser Oakland Replacement project. This 346-bed, hospital was part of a three-step plan that included reconfiguring the current hospital into outpatient and office space, tearing down an existing medical office building, and building a replacement 150,000 SF medical office building.
Our team provided schedule and subcontractor coordination in the initial phase of the project, then provided on-site Quality Control services for all electrical and low-voltage systems, as well as related Quality Review and Quality Assurance services. In addition, we provided site traffic management/control plan services to facilitate the construction project while minimizing disruption to the surrounding community.
Location: Oakland, CA
Role: Associate CM –Construction Management / Traffic Engineering
Size: 500,000 SF